This is a template prepared for the AguaClara Team at Cornell University. Each subteam is asked to use this template to create reports for documenting each semester's work. Do good work, and do it often!
This template is to write a thesis based on the style of Sungkyunkwan University (SKKU).
Please, double check the format to make it sure that the final output is stylized as the requirements of SKKU and your department.
Please, be aware that this template is not the official template file provided by SKKU. The template maker will not take any responsibility for any disadvantage due to this template.
Università degli studi di Napoli Federico II
Scuola Politecnica e delle Scienze di Base
Corso di Laurea Magistrale in Ingegneria Informatica
Tesi di Laurea Magistrale in Big Data Analytics and Business Intelligence
Artificial Bee Colony
Influence Maximization
Ovaj dokument predstavlja šablon po preporukama za pisanje diplomskih radova na Elektrotehnickom fakultetu.
This is a thesis template for the Faculty of Electrical Engineering, University of Banja Luka.
Beijing University of Posts and Telecommunications Master/Phd Thesis Template. This is unofficial so you should always double check.
北京邮电大学研究生论文模板。警告:本项目非官方实现,出现问题概不负责。
The LHC (Large Hadron Collider) will have a long shut down in the years of 2019 and 2020, referred to as LS2. During this stop the LHC injector complex will be upgraded to increase the luminosities, which will be the first step of the high luminosity LHC program (which will be realized during LS3 that takes place in 2024-2026). The LHCb experiment, whose main purpose is to study the CP-violation, will during this long stop be upgraded in order to withstand a higher radiation dose, and to be able to read out the detector at a rate of 40MHz,compared to 1MHz at present. This change will improve the trigger efficiency significantly. One of the LHCb sub-detectors the Trigger Tracker (TT), will be replaced by a new sub-detector called UT. This report presents the early stage design (preparation for mock-up building) of the box that will be isolating the new UT detector from the surroundings and to ensure optimal detector operation. Methods to fulfill requirements such as light and gas tightness, Faraday-cage behavior and condensation free temperatures, without breaking the fragile beryllium beam pipe, are established.